saravanakumardb1
|
b00af09942
|
docs(docker): roadmap v8 — peakpulse Phase A done + A3 ADR-0001 accepted
Per § 10 steps 9 + 10.
Step 9: Peakpulse backend Phase A complete.
cold 72.2 s, warm 2.7 s (96.3% reduction). Pattern from clock applied
verbatim plus .docker-deps/.gitkeep discoverability fix back-ported
to clock. Commits:
peakpulse@11a6bc5 feat(docker): Phase A on peakpulse backend
peakpulse@6523a1a fix(docker): track .docker-deps/.gitkeep
clock@1465e06b1 fix(docker): track .docker-deps/.gitkeep
clock@d69003c1f chore: dedupe .docker-deps in .gitignore
Step 10: A3 ADR accepted.
New file: docs/adr/0001-docker-build-lockfile-policy.md
Decision: short-term Option A (--lockfile=false) — already shipped in
Phase A; long-term Option C (vendored pnpm-lock.docker.yaml). Migration
triggered by production deployment, audit requirement, supply-chain
incident, or loss of BuildKit cache. Implementation sketch in ADR § 4.
Roadmap doc updates:
- § A7 metrics table: peakpulse row populated (72.2 s / 2.7 s).
- § A3: collapsed bullet list into decision-record summary linking ADR.
- § 10: steps 9 + 10 marked ✅; status banner v7 → v8.
Next per § 10: step 11 (Phase B docker-prep hardening) or step 12
(Phase E docker-doctor.sh linter). Phase E is higher-value as durable
insurance against F11/F13/F16/F17/F18 regressions across the ecosystem.
|