A prior rebase merged the v13/v13.1 edits into \xc2\xa710 with mangled text (steps 11\xe2\x80\x9320 out of order; step 10 garbled). Rebuilt the section cleanly from v12 base + appended the new v13/v13.1 steps: 11. Phase E1/E2/E5 12. Phase B 13. Phase B4 + E3/E4/E6 14. Phase C (8/9; C5 partial) 15. Phase D.1 16. Phase D.2 17. B7-4 AGENTS.md warnings 18. Phase D extension (MindLyst, LysnrAI, talk2obsidian) 19. Phase D.3 advisory cleanup 20. C5 partial validation (this session) Restored the lost "ported back to clock" trailing line for step 9. No content changes beyond what was already documented in v13/v13.1. |
||
|---|---|---|
| .. | ||
| adr | ||
| docker-build-optimization-roadmap.md | ||
| getting-started.md | ||
| hermes_dashboard_roadmap.md | ||
| hermes-disaster-recovery.md | ||
| hermes-operations.md | ||
| hermes-setup-upgrade-roadmap.md | ||
| operations.md | ||
| remove_user_interactive.md | ||
| repo-map.md | ||
| tooling-status.md | ||