saravanakumardb1
|
13e53d46bf
|
docs: add MIGRATION_GUIDE.md + update ROADMAP to 89% (248/278)
- MIGRATION_GUIDE.md: step-by-step for adopting @bytelyst/* in new projects
- ROADMAP: Phase 3B 25/28 (user/tracker keep custom auth, removed unused deps)
- ROADMAP: Phase 6 23/28 (docs updated, cleanup done, E2E needs running services)
- Test count: 277 tests across 16 suites
|
2026-02-13 00:09:01 -08:00 |
|
saravanakumardb1
|
fd6e3d7e8e
|
docs: update AGENTS.md + ROADMAP.md to 83% complete (232/278)
- AGENTS.md: added fastify-core, logger, testing to layout; updated dashboard consumer table; updated test count to 277
- ROADMAP.md: Phase 2B complete (29/29), Phase 5 Docker tasks (15/23), Phase 6 regression (17/28)
- Cross-repo regression verified: 277 tests pass, all 3 dashboards typecheck clean
|
2026-02-12 23:51:53 -08:00 |
|
saravanakumardb1
|
33a646c0fe
|
docs(roadmap): note CI workflows disabled (billing paused)
|
2026-02-12 23:30:58 -08:00 |
|
saravanakumardb1
|
ac24a6ba20
|
docs(roadmap): update to 77% complete (215/278 tasks)
This session:
- fastify-core: integrated into all 4 services (208 lines eliminated)
- react-auth: 10 tests added (jsdom + React Testing Library)
- @bytelyst/testing: new package with shared mocks, fixtures, helpers (10 tests)
- CI workflow: .github/workflows/ci.yml (build + test + typecheck, NO deploy)
- Total tests: 266 (was 246)
|
2026-02-12 23:01:59 -08:00 |
|
saravanakumardb1
|
a4099c8f9b
|
docs(roadmap): update to 72% complete (201/278 tasks)
New completions this session:
- Package tests: cosmos (12), config (15), auth (10), api-client (10), design-tokens (11)
- @bytelyst/fastify-core: new package with 8 tests (createServiceApp factory)
- @bytelyst/react-auth: enhanced with onLoginFallback, admin dashboard refactored
- Total tests: 246 (was 180)
|
2026-02-12 22:23:53 -08:00 |
|
saravanakumardb1
|
81452bc157
|
docs(roadmap): update task statuses — 59% complete (165/278 tasks)
Cross-referenced every task against actual codebase state:
- Phase 0: 14/14 ✅ (scaffolding complete)
- Phase 1A: 22/23 ✅ (errors — Docker verify pending)
- Phase 1B: 29/33 ⚠️ (cosmos — package tests pending)
- Phase 2A: 22/25 ⚠️ (config — package tests pending)
- Phase 2B: 22/29 ⚠️ (auth — tracker + E2E pending)
- Phase 2C: 0/24 🔲 (fastify-core — not started)
- Phase 3A: 13/17 ⚠️ (api-client — tests pending)
- Phase 3B: 6/28 ⚠️ (react-auth — extracted, not integrated)
- Phase 4: 19/24 ⚠️ (design-tokens — tests pending)
- Phase 5: 3/23 🔲 (CI/Docker — mostly not started)
- Phase 6: 15/28 ⚠️ (regression done, E2E pending)
- Bonus: @bytelyst/logger (not in original roadmap)
|
2026-02-12 22:10:24 -08:00 |
|
saravanakumardb1
|
90b9cf93d8
|
fix(common): configure ESLint 9 and fix lint issues
- Added @eslint/js dependency
- Updated eslint.config.js for ESLint 9 compatibility
- Added required globals (crypto, localStorage, React, etc.)
- Fixed unused imports and variables
- Disabled sort-imports temporarily
- Formatted all files with Prettier
|
2026-02-12 16:37:30 -08:00 |
|
saravanakumardb1
|
bf22b5ee4c
|
docs(roadmap): address 15 gaps found via codebase cross-reference
Gap Analysis added:
- G1: Route-level import rewiring (22 error files, 13 cosmos, 34 product-config)
- G2: Existing errors.test.ts files in 3 services need updating
- G3: 5th product-config copy in user-dashboard-web
- G4/G5: Admin dashboard API routes + repositories import product-config
- G6: growth-service webhooks.ts imports product-config
- G7: file: reference paths differ (services=3 levels, dashboards=2 levels)
- G8: pnpm install + lock file steps added to each integration
- G9: Rollback strategy added to Phase 0
- G10: Git branching strategy added to Phase 0
- G11: Docker file: reference solution (pre-copy script) in Phase 5
- G12: 24 auth-context consumer files need path updates (thin re-export pattern)
- G13: MindLyst Android MindLystTheme.kt added to Phase 4
- G14: @bytelyst/auth false dep on config removed (reads JWT_SECRET from env)
- G15: Dashboard repositories (8 files) importing cosmos added to Phase 1B
Revised: ~278 tasks, ~37-51 hours estimated
|
2026-02-12 10:55:03 -08:00 |
|
saravanakumardb1
|
69f18f2588
|
docs: add detailed phased roadmap with task checklists
- 7 phases (0-6 + future): scaffolding, P0 packages, P1 packages, P2 packages, design tokens, CI/CD, verification
- ~150 checkboxed tasks covering extract, test, integrate, cleanup, Docker, and docs
- Dependency-ordered execution: errors → cosmos → config → auth → fastify-core → api-client → react-auth → design-tokens
- Estimated ~28-41 hours total effort
|
2026-02-12 10:48:38 -08:00 |
|