Run Prettier over README and roadmap docs to satisfy format:check, and add
.prettierignore plus .gitignore entries for playwright-report/test-results so
generated e2e artifacts no longer break the format gate.
Generated with [Devin](https://cli.devin.ai/docs)
Co-Authored-By: Devin <158243242+devin-ai-integration[bot]@users.noreply.github.com>
Update UX_INTEGRATION_BYTELYST.md to mark all UX-1 tasks as completed
with commit SHA reference and update progress section.
Generated with [Devin](https://cli.devin.ai/docs)
Co-Authored-By: Devin <158243242+devin-ai-integration[bot]@users.noreply.github.com>
1) Dual-numbering reconciliation
- ROADMAP groups Phase 1 by topic (1.1-1.8); PRH groups by execution
day (1.A-1.F). Added bidirectional mapping table to both docs so
agents can cross-reference any phase reference unambiguously.
2) Fresh-agent quick pointer at top of ROADMAP
- New section tells a new agent exactly which 4 docs to read, in
what order, and which task to pick up first (1.A from the tracker).
3) Broken sub-roadmap links neutralised
- 03_RICH_ITEMS_ROADMAP.md, 04_AGENT_API_ROADMAP.md,
05_INTAKE_ROADMAP.md were linked but did not exist. Replaced with
plain text + 'create when Phase N begins' note so the link doesn't
404. Matches the pattern already used in IMPLEMENTATION_TRACKER.
4) Runbook stubs created (Phase 1.F.11/1.F.12 placeholders)
- docs/runbooks/MEK_ROTATION.md — adapted from NoteLett bcad7d3
- docs/runbooks/SECRET_MANAGEMENT.md — secret inventory + resolution
path + compromise procedure + PII scrubbing rule
Each is a stub now; full content lands when Phase 1.F executes.
5) Stale 'today' wording removed from PRH baseline table
- Replaced 'after fix today' with 'as of 2026-05-25' so the doc
ages cleanly.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>